top of page
Search

Gas Fired Boiler replacement completed at UoR EATS building!

  • emily77390
  • 7 days ago
  • 1 min read

UoR, Whiteknights Campus, EATS building

We replaced four existing floor standing gas fired boilers with six boilers mounted back-to-back on a cascade framework.

Also included the installation of a plate heat exchanger to create primary and secondary circuits and the replacement of two DHW cylinders.

Gas safe system installed including sensors, solenoid valve and knock off buttons.


Before, During and After pictures below.


 
 
 

Comentários


bottom of page